How to repair the broken rotating cylinder of the automatic filling machine?

Leave a message

Technology is changing every aspect of our lives. The work that used to be done manually is now all done by the automatic filling machine, which is efficient and of better quality. Even the product filling that was difficult to do manually before, after using the automatic filling machine, everything seems very easy. It is for this reason that the automatic filling machine can be truly integrated with the production of the enterprise. However, after a lot of work and long-term use, some pneumatic components of the automatic filling machine will be damaged and leak due to long-term rotation friction and repeated work. At this time, please replace the appropriate seal in time. When replacing the seal, pay attention to some details. When encountering a broken rotating cylinder of the automatic filling machine, how to repair it? Let's take a look at the suggestions given by the technicians.
How to repair the rotating cylinder of the automatic filling machine equipment if it is broken? The following methods can be used to solve the problem:
1. Remove the back cover of the automatic filling machine equipment, remove the stainless steel ball valve, and remove the air source pipe, and remove the rotating cylinder
2. Loosen the set screws of the front limit block, remove the positioning block, and push out the shaft at the exposed end of the shaft. Note the position of the shaft before pushing it out so that it can be marked
3. Remove the damaged sealing ring, wipe the shaft of the automatic filling machine equipment clean, add appropriate lubricating oil to the grooves of each sealing ring of the shaft, replace the sealing ring and push it back to the original position, and use a wrench to check whether the rotation angle is 90
4. After installation, install the positioning block and tighten the screws to the hole. Be careful to tighten it well, otherwise the shaft may fly out and injure people when the automatic filling machine equipment is ventilated
5. After assembly, conduct ventilation test, it should be flexible and leak-proof, and install the ball valve and back cover in the original position